In Trench H we are still slowly removing plaster floors and have exposed the edges of a burial. This pit feature in Trench H is the last burial in the sequence of Building 12. Earlier in the week red paint was revealed on two different floors in the same general […]
21 JULY 2013: LEARNING THE SYSTEM AND THE PRE-EXCAVATION SITE TOUR
21 JULY 2013: LEARNING THE SYSTEM AND THE PRE-EXCAVATION SITE TOUR
The trenches now have a shady covering for the dig teams, the geotextile has been removed and the trenches have been revealed and cleaned. So now it is down to the important task of learning the recording system used on site. A thorough explanation of the context sheets preceded the […]